Recent changes
Jump to navigation
Jump to search
Track the most recent changes to the wiki on this page.
List of abbreviations:
- N
- This edit created a new page (also see list of new pages)
- m
- This is a minor edit
- b
- This edit was performed by a bot
- (±123)
- The page size changed by this number of bytes
1 September 2026
|
|
N 07:40 | Planning parameters 3 changes hist +3,011 [Jakobbuis (3×)] | |||
|
|
07:40 (cur | prev) +10 Jakobbuis talk contribs (→Known limitations) | ||||
|
|
07:40 (cur | prev) −1 Jakobbuis talk contribs | ||||
| N |
|
07:38 (cur | prev) +3,002 Jakobbuis talk contribs (Created page with "= Planning parameters = This article defines the numbers used for long-term capacity planning: planning work beyond the currently in-progress scope. It exists so that roadmap dates are derived from a shared, versioned set of parameters rather than re-argued each time. Scope: these parameters are for '''planning at the horizon level''' — sizing inbound work, projecting when a project can start, and testing whether a proposed commitment fits. They are not a substitute...") | |||
| N 07:37 | Kimai diffhist +61 Jakobbuis talk contribs (Created page with "Time-tracking tool. https://timetracking.delftsolutions.nl/") | ||||
| N 07:30 | A-Dato Lynx diffhist +125 Jakobbuis talk contribs (Created page with "Lynx is the planning tool we use to do Critical Chain Project Management (CCPM) to our work. https://lynxonline.a-dato.com/") | ||||
| 07:22 | Internal diffhist +42 Jakobbuis talk contribs (→Work Process) | ||||
31 August 2026
|
|
02:25 | Rebooting Offsite 2 changes hist 0 [Vincent (2×)] | |||
|
|
02:25 (cur | prev) −9 Vincent talk contribs Tag: Manual revert | ||||
|
|
02:24 (cur | prev) +9 Vincent talk contribs | ||||